Supply of 8 Port Manageable switch with 2 SFP Ports 1 GBPS , 16 Port
Manageable switch with 4 SFP Ports 1 GBP , 24 Port
Manageable switch , SFP Modules , LC Type Patch cord ,
OFC Cable 6 Core Armoured Single Mode , LIU 24 PORT
FULLY LOADED , HDPE Pipe , Digging , 2 NU Rack , 4 NU
Rack , UPS 1KVA Line Interactive , Media Convertor Pair ,
AMC for 2 years at Allahabad, Uttar pradesh
Tender Detail |
| Reference Number |
: GEM/2025/B/6680311 |
| Tender Source |
: https://bidplus.gem.gov.in/showbiddocument/8347503 |
| State |
: Uttar Pradesh |
| City |
: Allahabad |
| Tender value |
: 6000000.0 |
| Earnest money deposit (EMD) |
: 120000.0 |
| Type |
: Open |
| Category |
: Goods |
| Description |
: Evaluation Method : Total Value Wise Evaluation Mse Exceptions For Years Of Experience : No |
Important Dates |
| Bid Submission Start Date |
: Sept. 24, 2025, 9:56 p.m. |
| Bid Submission End Date |
: Oct. 6, 2025, 11 a.m. |
| Published on |
: Sept. 24, 2025, 9:56 p.m. |
Organisation Data |
| Organisation Name |
: Indian Army |
| Department |
: Department Of Military Affairs |
| Organisation Name * |
: Indian Army |
| Organisation Type * |
: DEFENCE |
| Organisation Authority * |
: Multistate |
| Organisation Parent * |
: Indian Army |
| Organisation Abbreviation * |
: IA |
| Address |
: Allahabad |
Document Data |
| Emd Data |
:
| EMD Amount | 120000.0 |
| Advisory Bank | State Bank of India |
| EMD Percentage(%) | |
|
| Department Name |
: Department Of Military Affairs |
| Office Name |
: *********** |
| Organisation Name |
: Indian Army |
| Item Category |
: 8 Port Manageable switch with 2 SFP Ports 1 GBPS , 16 Port Manageable switch with 4 SFP Ports 1 GBP , 24 Port Manageable switch , SFP Modules , LC Type Patch cord , OFC Cable 6 Core Armoured Single Mode , LIU 24 PORT FULLY LOADED , HDPE Pipe , Digging , 2 NU Rack , 4 NU Rack , UPS 1KVA Line Interactive , Media Convertor Pair , AMC for 2 years |
| Total Quantity |
: 8239 |
| Primary Product Category |
: Digging |
| Boq Title |
: DIGGING WITH OFC LAYING |
Other Document Data |
| Time Allowed For Technical Clarifications During Technical Evaluation |
: 2 Days |
| Evaluation Method |
: Total Value Wise Evaluation |
Prequalification Data |
| Startup Exemption For Years Of Experience And Turnover |
: No |
| Mse Exemption For Years Of Experience And Turnover |
: No |
| Document Required From Seller |
: Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer |
| Past Performance |
: 20 % |
| Bid To Ra Enabled |
: Yes |
* denotes processed/normalized values by our data processing