SUPPLY-AC AND VENTILATION SYSTEM -GSS DUCT SHEET-18 G-VENTILATION SYSTEM -275 GSM-MAKE-TATA OR SAIL OR JINDAL , SUPPLY-AC AND VENTILATION SYSTEM -GSS DUCT SHEET-20 G-VENTILATION SYSTEM-275 GSM-MAKE-TATA OR SAIL OR JINDAL , SUPPLY-AC AND VENTILATION SYSTEM - GSS DUCT SHEET-22 G-VENTILATION SYSTEM -275 GSM- MAKE-TATA OR SAIL OR JINDAL , SUPPLY-AC AND VENTILATION SYSTEM -MS ANGLE SUPPORT , SUPPLY-AC AND VENTILATION SYSTEM -VOLUME CONTROL DAMPER - MAKE-COSMIC EQUIPMENT INDIA PVT LTD , SUPPLY-AC AND VENTILATION SYSTEM-MOTORISED FIRE DAMPER -RATING 120 MINUTES-MAKE-COSMIC EQUIPMENT INDIA PVT LTD , SUPPLY-AC AND VENTILATION SYSTEM -MOTORISED ACTUATOR FOR FIRE DAMPER-BELIMO MAKE , SUPPLY-AC AND VENTILATION SYSTEM -WEATHER PROOFING OF EXPOSED DUCT-POLYMERIC FIBRE GLASS MEMBRANE-3 MM THICK-MAKE-HYPERPLAS , ETC-AC AND VENTILATION SYSTEM-DUCTING-18 G-275 GSM-MAKE-TATA OR SAIL OR JINDAL , ETC-AC AND VENTILATION SYSTEM -DUCTING-20 G- 275 GSM-MAKE-TATA OR SAIL OR JINDAL , ETC-AC AND VENTILATION SYSTEM -DUCTING-22 G -275 GSM- MAKE- TATA OR SAIL OR JINDAL , ETC-AC AND VENTILATION SYSTEM -MS ANGLE SUPPORT , ETC-AC AND VENTILATION SYSTEM -VOLUME CONTROL DAMPER- MAKE-COSMIC EQUIPMENT INDIA PVT LTD , ETC-AC AND VENTILATION SYSTEM -MOTORISED FIRE DAMPER- RATING 120 MINUTES- MAKE-COSMIC EQUIPMENT INDIA PVT LTD , ETC-AC AND VENTILATION SYSTEM -MOTORISED ACTUATOR FOR FIRE DAMPER-BELIMO MAKE , ETC-AC AND VENTILATION SYSTEM -WEATHER PROOFING MATERIAL FOR EXPOSED DUCT OUTSIDE GIS HALL-POLYMERIC FIBRE GLASS MEMBRANE-3 MM THICK-MAKE-HYPERPLAS , ETC-AC AND VENTILATION SYSTEM -MANUAL RE-FABRICATION OF DUCT WITH MALE PROFILE-GSS-18G-275 GSM , ETC-AC AND VENTILATION SYSTEM -MACHINE RE-FABRICATION OF DUCT WITH FEMALE PROFILE-GSS-18G-275 GSM at Patratu, Jharkhand


Tender Detail

Reference Number : GEM/2024/B/4609435
Tender Source : https://bidplus.gem.gov.in/showbiddocument/6033699
State : Jharkhand
City : Patratu
Type : Open
Category : Goods
Description : Bid Offer Validity : 120 (Days) Evaluation Method : Total Value Wise Evaluation Mse Exceptions For Years Of Experience : No Quantity : 3065

Important Dates

Bid Submission Start Date : Feb. 12, 2024, 3:15 p.m.
Bid Submission End Date : Feb. 22, 2024, 4 p.m.
Published on : Feb. 12, 2024, 3:15 p.m.
Bid Open Date : Feb. 22, 2024, 4:30 p.m.

Organisation Data

Organisation Name : Bharat Heavy Electricals Limited
Organisation Sector : Electrical
Department : Department Of Heavy Industries
Organisation Name * : Bharat Heavy Electricals Limited
Organisation Type * : PSU
Organisation Authority * : Central
Organisation Parent * : Bharat Heavy Electricals Limited
Organisation Abbreviation * : BHEL
Organisation Synonyms * : Bharat Heavy Electricals, Bharat Heavy Electricals Ltd, Bhel Bpl, Bhel Bhopal, Bhel Trichy, Bhel Haridwar, Bhel Hwr, Bharat Heavy Electricals Limited Haridwar
Address : 829119,Bhel C/O, Patratu Super Thermal Power Station Expansion, Phase-1(3x800 Mw) Puvnl, Patratu, Dist- Ramgarh (Jharkhand), Pin: 829119

Documents

  • GeM-Bidding-6033699.pdf

  • Document Data

    Epbg Data :
    Advisory BankState Bank of India
    ePBG Percentage(%)5.0
    Duration of ePBG required (Months).
    Department Name : Department Of Heavy Industry
    Office Name : 10340020-tbg, Noida
    Ministry State Name : Ministry Of Heavy Industries And Public Enterprises
    Organisation Name : Bharat Heavy Electricals Limited (bhel)
    Item Category : SUPPLY-AC AND VENTILATION SYSTEM -GSS DUCT SHEET-18 G-VENTILATION SYSTEM -275 GSM-MAKE-TATA OR SAIL OR JINDAL , SUPPLY-AC AND VENTILATION SYSTEM -GSS DUCT SHEET-20 G-VENTILATION SYSTEM-275 GSM-MAKE-TATA OR SAIL OR JINDAL , SUPPLY-AC AND VENTILATION SYSTEM - GSS DUCT SHEET-22 G-VENTILATION SYSTEM -275 GSM- MAKE-TATA OR SAIL OR JINDAL , SUPPLY-AC AND VENTILATION SYSTEM -MS ANGLE SUPPORT , SUPPLY-AC AND VENTILATION SYSTEM -VOLUME CONTROL DAMPER - MAKE-COSMIC EQUIPMENT INDIA PVT LTD , SUPPLY-AC AND VENTILATION SYSTEM-MOTORISED FIRE DAMPER -RATING 120 MINUTES-MAKE-COSMIC EQUIPMENT INDIA PVT LTD , SUPPLY-AC AND VENTILATION SYSTEM -MOTORISED ACTUATOR FOR FIRE DAMPER-BELIMO MAKE , SUPPLY-AC AND VENTILATION SYSTEM -WEATHER PROOFING OF EXPOSED DUCT-POLYMERIC FIBRE GLASS MEMBRANE-3 MM THICK-MAKE-HYPERPLAS , ETC-AC AND VENTILATION SYSTEM-DUCTING-18 G-275 GSM-MAKE-TATA OR SAIL OR JINDAL , ETC-AC AND VENTILATION SYSTEM -DUCTING-20 G- 275 GSM-MAKE-TATA OR SAIL OR JINDAL , ETC-AC AND VENTILATION SYSTEM -DUCTING-22 G -275 GSM- MAKE- TATA OR SAIL OR JINDAL , ETC-AC AND VENTILATION SYSTEM -MS ANGLE SUPPORT , ETC-AC AND VENTILATION SYSTEM -VOLUME CONTROL DAMPER- MAKE-COSMIC EQUIPMENT INDIA PVT LTD , ETC-AC AND VENTILATION SYSTEM -MOTORISED FIRE DAMPER- RATING 120 MINUTES- MAKE-COSMIC EQUIPMENT INDIA PVT LTD , ETC-AC AND VENTILATION SYSTEM -MOTORISED ACTUATOR FOR FIRE DAMPER-BELIMO MAKE , ETC-AC AND VENTILATION SYSTEM -WEATHER PROOFING MATERIAL FOR EXPOSED DUCT OUTSIDE GIS HALL-POLYMERIC FIBRE GLASS MEMBRANE-3 MM THICK-MAKE-HYPERPLAS , ETC-AC AND VENTILATION SYSTEM -MANUAL RE-FABRICATION OF DUCT WITH MALE PROFILE-GSS-18G-275 GSM , ETC-AC AND VENTILATION SYSTEM -MACHINE RE-FABRICATION OF DUCT WITH FEMALE PROFILE-GSS-18G-275 GSM
    Total Quantity : 3065
    Primary Product Category : SUPPLY-AC AND VENTILATION SYSTEM -GSS DUCT SHEET-18 G-VENTILATION SYSTEM -275 GSM-MAKE-TATA OR SAIL OR JINDAL
    Boq Title : Supply and ETC of ACVS for PVUNL PATRATU TPS Project

    Other Document Data

    Bid Offer Validity : 120 (Days)
    Time Allowed For Technical Clarifications During Technical Evaluation : 3 Days
    Evaluation Method : Total Value Wise Evaluation
    Inspection Required By Empanelled Inspection Authority Agencies Pre Registered With Gem : No
    Payment Timelines : Payments Shall Be Made To The Seller Within 90 Days Of Issue Of Consignee Receipt-Cum-Acceptance Certificate (Crac) And On-Line Submission Of Bills (This Is In Supersession Of 10 Days Time As Provided In Clause 12 Of Gem Gtc)

    Prequalification Data

    Startup Exemption For Years Of Experience And Turnover : No
    Mse Exemption For Years Of Experience And Turnover : No
    Document Required From Seller : Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Additional Doc 3 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
    Bid To Ra Enabled : No

    * denotes processed/normalized values by our data processing