Supply of Sch1 Resin Cast Spout Assembly , Sch2 Spout Fitting with
Connector , Sch3 Front Insulated Connector R , Sch4 Front
Insulated Connector Y , Sch5 Front Insulated Connector B ,
Sch6 Rear Insulated Connector R , Sch7 Rear Insulated
Connector Y , Sch8 Rear Insulated Connector B , Sch9
Instrument Control Box , Sch10 Vertical Isolating VCB
Trolley complete , Sch11 Earth Leakage Relay with CBCT ,
Sch12 Power Converter 110 V AC to 110 V DC , Sch13
Tripping Coil 110V DC 220V DC , Sch14 Mechanism for
Tripping Coil , Sch15 Master Trip Relay , Sch16 Digital
Protection Relay , Sch17 Epoxy Resin Cast Current
Transformer , Sch18 Side Cable Box , 11KV 110V Resin Cast
3Ph Potential Transformer at Ukhra, West bengal
Tender Detail |
Reference Number |
: GEM/2025/B/6680658 |
Tender Source |
: https://bidplus.gem.gov.in/showbiddocument/8347901 |
State |
: West Bengal |
City |
: Ukhra |
Tender value |
: 500000.0 |
Earnest money deposit (EMD) |
: 40000.0 |
Type |
: Open |
Category |
: Goods |
Description |
: Evaluation Method : Total Value Wise Evaluation |
Important Dates |
Bid Submission Start Date |
: Sept. 13, 2025, 1:57 p.m. |
Bid Submission End Date |
: Oct. 11, 2025, 9 a.m. |
Published on |
: Sept. 13, 2025, 1:57 p.m. |
Organisation Data |
Organisation Name |
: Eastern Coalfields Limited |
Organisation Sector |
: Coal |
Organisation Name * |
: Eastern Coalfields Limited |
Organisation Type * |
: PSU |
Organisation Authority * |
: Central |
Organisation Parent * |
: Coal India Limited |
Organisation Synonyms * |
: Eastern Coalfields Limited (Ecl) |
Address |
: 713363,Office Of Gm, Bankolka
Area Po Ukhra Paschim
Burdwan Wb |
Document Data |
Emd Data |
:
EMD Amount | 40000.0 |
Advisory Bank | State Bank of India |
EMD Percentage(%) | |
|
Department Name |
: Coal India Limited |
Office Name |
: West Bengal |
Organisation Name |
: Eastern Coalfields Limited |
Item Category |
: Sch1 Resin Cast Spout Assembly , Sch2 Spout Fitting with Connector , Sch3 Front Insulated Connector R , Sch4 Front Insulated Connector Y , Sch5 Front Insulated Connector B , Sch6 Rear Insulated Connector R , Sch7 Rear Insulated Connector Y , Sch8 Rear Insulated Connector B , Sch9 Instrument Control Box , Sch10 Vertical Isolating VCB Trolley complete , Sch11 Earth Leakage Relay with CBCT , Sch12 Power Converter 110 V AC to 110 V DC , Sch13 Tripping Coil 110V DC 220V DC , Sch14 Mechanism for Tripping Coil , Sch15 Master Trip Relay , Sch16 Digital Protection Relay , Sch17 Epoxy Resin Cast Current Transformer , Sch18 Side Cable Box , 11KV 110V Resin Cast 3Ph Potential Transformer |
Total Quantity |
: 70 |
Primary Product Category |
: Sch10 Vertical Isolating VCB Trolley complete |
Other Document Data |
Time Allowed For Technical Clarifications During Technical Evaluation |
: 7 Days |
Evaluation Method |
: Total Value Wise Evaluation |
Payment Timelines |
: Payments Shall Be Made To The Seller Within 21 Days Of Issue Of Consignee Receipt-Cum-Acceptance Certificate (Crac) And On-Line Submission Of Bills (This Is In Supersession Of 10 Days Time As Provided In Clause 12 Of Gem Gtc) |
Itc Available To Buyer |
: Yes |
Prequalification Data |
Document Required From Seller |
: Experience Criteria,Past Performance,Certificate (Requested in ATC),OEM Authorization Certificate,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer |
Past Performance |
: 30 % |
Bid To Ra Enabled |
: No |
* denotes processed/normalized values by our data processing