Supply of Z7-ISRAEL-MB465A-XX, Power Supply Board , Z7-ISRAEL- MB465A-00, Power Supply Board (PSB) , Z6-ISRAEL-078210- A-00, Turrent Azimuth Sensor (TAS) at Agra, Uttar pradesh


Tender Detail

Reference Number : GEM/2025/B/5844908
Tender Source : https://bidplus.gem.gov.in/showbiddocument/7404626
State : Uttar Pradesh
City : Agra
Type : Open
Category : Goods
Description : Bid Offer Validity : 120 (Days) Evaluation Method : Item Wise Evaluation Minimum Avg Turnover : 15 Lakh (S) Mse Exceptions For Years Of Experience : No Quantity : 137

Important Dates

Bid Submission Start Date : Jan. 21, 2025, 9:31 a.m.
Bid Submission End Date : Feb. 24, 2025, 10 a.m.
Published on : Jan. 21, 2025, 9:31 a.m.
Bid Open Date : Feb. 11, 2025, 10:30 a.m.

Organisation Data

Organisation Name : Department Of Military Affairs
Address : Agra

Documents

  • GeM-Bidding-7404626.pdf

  • Document Data

    Epbg Data :
    Advisory BankState Bank of India
    ePBG Percentage(%)3.0
    Duration of ePBG required (Months).
    Department Name : Department Of Military Affairs
    Office Name : ***********
    Ministry State Name : Ministry Of Defence
    Organisation Name : Indian Army
    Item Category : Z7-ISRAEL-MB465A-XX, Power Supply Board , Z7-ISRAEL- MB465A-00, Power Supply Board (PSB) , Z6-ISRAEL-078210- A-00, Turrent Azimuth Sensor (TAS)
    Total Quantity : 137
    Primary Product Category : Z7-ISRAEL-MB465A-XX, Power Supply Board
    Ra Qualification Rule : H1-Highest Priced Bid Elimination

    Other Document Data

    Bid Offer Validity : 120 (Days)
    Time Allowed For Technical Clarifications During Technical Evaluation : 2 Days
    Evaluation Method : Item Wise Evaluation
    Inspection Required By Empanelled Inspection Authority Agencies Pre Registered With Gem : Yes
    Inspection To Be Carried Out By Buyers Own Empanelled Agency : Yes
    Type Of Inspection : Stage-Wise Inspection
    Name Of The Empanelled Inspection Agency Authority : Dgqa

    Prequalification Data

    Startup Exemption For Years Of Experience And Turnover : No
    Mse Exemption For Years Of Experience And Turnover : No
    Document Required From Seller : Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
    Years Of Past Experience Required For Same Similar Service : 2 Year (s)
    Past Performance : 10 %
    Minimum Average Annual Turnover Of The Bidder For 3 Years : 15 Lakh (s)
    Oem Average Turnover Last 3 Years : 15 Lakh (s)
    Bid To Ra Enabled : Yes

    * denotes processed/normalized values by our data processing