Supply of MCCB 3 POLE WITH 2 AUX CONTACTS 100A - 10 , MCCB 3
POLE WITH 2 AUX CONTACTS 200A - 20 , MCCB 3 POLE
WITH 2 AUX CONTACTS 300A - 30 , MCCB 3 POLE WITH 2
AUX CONTACTS 500A - 40 , MCCB 3 POLE WITH 2 AUX
CONTACTS 63A - 50 , MPCB 3 POLE AC 1NO+ 1NC 16A - 60 ,
MPCB 4 POLE AC 1NO+ 1NC 6A - 70 , MCB 2 POLE AC 16A -
80 , MCB 2 POLE AC 6A - 90 , MCB 2 POLE DC 16A - 100 ,
MCB 3 POLE AC 6A - 110 , MCB 3 POLE 16A WITH 2 AUX
CONTACTS - 120 , MCB 3 POLE 32A WITH 2 AUX CONTACTS
- 130 , MCB 4 POLE AC 6A - 140 , AUX CONTACTOR DC
2NO+ 2NC 220V DC - 150 , AUX CONTACTOR DC 3NO+ 1NC
220V DC - 160 , AUX CONTACTOR DC 4NO 220V DC - 170 ,
ADD ON FOR AUX CONTACTOR 2NO - 180 , ADD ON FOR
AUX CONTACTOR 2NO+ 2NC - 190 at Bangalore, Karnataka
Tender Detail |
Reference Number |
: GEM/2024/B/5470546 GEM/2024/R/418139 |
Tender Source |
: https://bidplus.gem.gov.in/showbiddocument/6984262 |
State |
: Karnataka |
City |
: Bangalore |
Type |
: Open |
Category |
: Goods |
Description |
: Bid Offer Validity : 90 (Days) Evaluation Method : Group Wise Evaluation Minimum Avg Turnover : 7 Lakh (S) Quantity : 591 |
Important Dates |
Bid Submission Start Date |
: Dec. 11, 2024, 10 a.m. |
Bid Submission End Date |
: Dec. 12, 2024, 11 a.m. |
Published on |
: Dec. 11, 2024, 10 a.m. |
Bid Open Date |
: Oct. 17, 2024, 3:30 p.m. |
Organisation Data |
Organisation Name |
: Bharat Heavy Electricals Limited |
Organisation Sector |
: Electrical |
Department |
: Department Of Heavy Industries |
Organisation Name * |
: Bharat Heavy Electricals Limited |
Organisation Type * |
: PSU |
Organisation Authority * |
: Central |
Organisation Parent * |
: Bharat Heavy Electricals Limited |
Organisation Abbreviation * |
: BHEL |
Organisation Synonyms * |
: Bharat Heavy Electricals, Bharat Heavy Electricals Ltd, Bhel Bpl, Bhel Bhopal, Bhel Trichy, Bhel Haridwar, Bhel Hwr, Bharat Heavy Electricals Limited Haridwar |
Address |
: 560012,Bharat Heavy
Electricals Limited, Electric And
Photovoltaic Division, Prof. Cnr
Rao Circle, Iisc Post,
Malleshwaram |
Document Data |
Epbg Data |
:
Advisory Bank | IDBI Bank |
ePBG Percentage(%) | 5.0 |
Duration of ePBG required (Months). | |
|
Department Name |
: Department Of Heavy Industry |
Office Name |
: 10450001-epd, Bangalore |
Ministry State Name |
: Ministry Of Heavy Industries And Public Enterprises |
Organisation Name |
: Bharat Heavy Electricals Limited (bhel) |
Item Category |
: MCCB 3 POLE WITH 2 AUX CONTACTS 100A - 10 , MCCB 3 POLE WITH 2 AUX CONTACTS 200A - 20 , MCCB 3 POLE WITH 2 AUX CONTACTS 300A - 30 , MCCB 3 POLE WITH 2 AUX CONTACTS 500A - 40 , MCCB 3 POLE WITH 2 AUX CONTACTS 63A - 50 , MPCB 3 POLE AC 1NO+ 1NC 16A - 60 , MPCB 4 POLE AC 1NO+ 1NC 6A - 70 , MCB 2 POLE AC 16A - 80 , MCB 2 POLE AC 6A - 90 , MCB 2 POLE DC 16A - 100 , MCB 3 POLE AC 6A - 110 , MCB 3 POLE 16A WITH 2 AUX CONTACTS - 120 , MCB 3 POLE 32A WITH 2 AUX CONTACTS - 130 , MCB 4 POLE AC 6A - 140 , AUX CONTACTOR DC 2NO+ 2NC 220V DC - 150 , AUX CONTACTOR DC 3NO+ 1NC 220V DC - 160 , AUX CONTACTOR DC 4NO 220V DC - 170 , ADD ON FOR AUX CONTACTOR 2NO - 180 , ADD ON FOR AUX CONTACTOR 2NO+ 2NC - 190 |
Total Quantity |
: 591 |
Primary Product Category |
: MCCB 3 POLE WITH 2 AUX CONTACTS 100A - 10 |
Ra Qualification Rule |
: H1-Highest Priced Bid Elimination |
Other Document Data |
Bid Offer Validity |
: 90 (Days) |
Time Allowed For Technical Clarifications During Technical Evaluation |
: 2 Days |
Evaluation Method |
: Group Wise Evaluation |
Inspection Required By Empanelled Inspection Authority Agencies Pre Registered With Gem |
: No |
Payment Timelines |
: Payments Shall Be Made To The Seller Within 90 Days Of Issue Of Consignee Receipt-Cum-Acceptance Certificate (Crac) And On-Line Submission Of Bills (This Is In Supersession Of 10 Days Time As Provided In Clause 12 Of Gem Gtc) |
Prequalification Data |
Document Required From Seller |
: Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC),Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer |
Years Of Past Experience Required For Same Similar Service |
: 2 Year (s) |
Past Performance |
: 20 % |
Minimum Average Annual Turnover Of The Bidder For 3 Years |
: 7 Lakh (s) |
Oem Average Turnover Last 3 Years |
: 7 Lakh (s) |
Mse Exemption For Turnover |
: Yes |
Startup Exemption For Turnover |
: Yes |
Bid To Ra Enabled |
: Yes |
* denotes processed/normalized values by our data processing