Supply of solar delinator solar edge indicator size 1200 mmas per irc 67 2022 technical details of solar guide posts made of mild steel of 75 76 od and 1 5mm thickness with pure polyester powder coating with the minimum thickness of powder coating of not less than 60 micron for protection against corrosion the surface should be concealed so that there should not be any exposed surface without powder coating the posts should have a circular design with the height of 900 mm above the ground and 300mm base underground total 1200mm the guide post shall have 8 red leds on equalivant gap total 48leds for brighter viewing of the motorists in fog the leds shall start blinking as it gets dim the solar delineator shall have solar panel on top of the surface for recharging further it should have 2 strips of 150mm each of type xi sheeting specifications as per irc 67 and astm d 4956 which would ensure to obtain clear visibility of the road alignment during night time also at East sikkim, Sikkim


Tender Detail

Reference Number : GEM/2025/B/6171422
Tender Source : https://bidplus.gem.gov.in/showbiddocument/7774379
State : Sikkim
City : East Sikkim
Tender value : 22350000.0
Earnest money deposit (EMD) : 447000.0
Type : Open
Category : Goods
Description : Bid Offer Validity : 180 (Days) Evaluation Method : Total Value Wise Evaluation Mse Exceptions For Years Of Experience : No Quantity : 10180

Important Dates

Bid Submission Start Date : April 26, 2025, 9:51 a.m.
Bid Submission End Date : May 17, 2025, 10 a.m.
Published on : April 26, 2025, 9:51 a.m.
Bid Open Date : May 17, 2025, 10:30 a.m.

Organisation Data

Organisation Name : Ministry Of Defence
Organisation Sector : Defence
Department : Department Of Defence
Organisation Name * : Department Of Defence
Organisation Type * : DEFENCE
Organisation Authority * : Central
Organisation Parent * : Department Of Defence
Address : East Sikkim

Documents

  • GeM-Bidding-7774379.pdf

  • Document Data

    Emd Data :
    EMD Amount447000.0
    Advisory BankState Bank of India
    EMD Percentage(%)
    Department Name : Department Of Defence
    Office Name : ***********
    Ministry State Name : Ministry Of Defence
    Organisation Name : Border Road Organisation
    Item Category : Title1 , Title2 , Title3 , Title4 , Title5 , Title6 , Title7 , Title8 , Title9 , Title10 , Title11 , Title12 , Title13 , Title14 , Title15 , Title16 , Title17 , Title18 , Title19 , Title20 , Title21 , Title22 , Title23 , Title24 , Title25 , Title26 , Title27 , Title28 , Title29 , Title30 , Title31 , Title32 , Title33 , Title34 , Title35 , Title36 , Title37 , Title38 , Title39 , Title40 , Title41 , Title42 , Title43 , Title44 , Title45 , Title46 , Title47 , Title48 , Title49 , Title50 , Title51 , Title52 , Title53 , Title54 , Title55 , Title56 , Title57 , Title58 , Title59 , Title60 , Title61 , Title62 , Title63 , Title64 , Title65 , Title66
    Total Quantity : 10180
    Primary Product Category : Title3
    Ra Qualification Rule : H1-Highest Priced Bid Elimination

    Other Document Data

    Bid Offer Validity : 180 (Days)
    Time Allowed For Technical Clarifications During Technical Evaluation : 2 Days
    Evaluation Method : Total Value Wise Evaluation
    Inspection Required By Empanelled Inspection Authority Agencies Pre Registered With Gem : No

    Prequalification Data

    Startup Exemption For Years Of Experience And Turnover : No
    Mse Exemption For Years Of Experience And Turnover : No
    Document Required From Seller : Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC),Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
    Years Of Past Experience Required For Same Similar Service : 3 Year (s)
    Past Performance : 80 %
    Bid To Ra Enabled : Yes

    * denotes processed/normalized values by our data processing