Supply of CO2 Fire Extinguisher , Co2 Fire Extinguishers 2kg , ABC
Type Fire ext 6kg MAP , K Type wet chemical fire
extinguishers for mess area 6kg , D type fire extinguishers
2kg TEC Powder , Foam Fire Extinguisher 9 L , Hose pipe
RRL 15 meter , Fire Suit Complete set , Sealing Hook , Fire
Revolving BrancSteel , Discharge Tube with Horn , ABC 6kg
Discharge Tube with Horn , Mechanical Fire Hose Nozzle
with horn , Extension Ladder rope , Fire Rope 10 mm dia, 10
m long , Foldable Stretcher , Electrical Rescue Hook
Insulated , Hydrant Coupling Washers , Hydrant Blank Caps ,
SCBA Set , Hose reel drum washer , Fire extinguhsers
washer co2 , Foam Making 5x with pickup tube , Foam
Making 10x with pickup tube , Fog branch , Triple pupose
branch , Collecting head two way , non sparking Firemen
Axe , collecting head four way , safety helmet red , height
rescue kit , wheel chock , Tool box , Full body harness
Safety Belt , Foam pickup tube , Hose reel shut off nozzle ,
Foam AFFF , Hose reel pipe 30 mtr , Hanging hook Co2
extinguisher , Hanging hook ABC 6kg , Hosereel drum at Kanpur, Uttar pradesh
Tender Detail |
| Reference Number |
: GEM/2026/B/7087815 |
| Tender Source |
: https://bidplus.gem.gov.in/showbiddocument/8813034 |
| State |
: Uttar Pradesh |
| City |
: Kanpur |
| Tender value |
: 7546000.0 |
| Earnest money deposit (EMD) |
: 154000.0 |
| Type |
: Open |
| Category |
: Goods |
| Description |
: Evaluation Method : Total Value Wise Evaluation |
Important Dates |
| Bid Submission Start Date |
: Jan. 9, 2026, 4:09 p.m. |
| Bid Submission End Date |
: Jan. 31, 2026, 3 p.m. |
| Published on |
: Jan. 9, 2026, 4:09 p.m. |
Organisation Data |
| Organisation Name |
: Indian Institute Of Technology |
| Organisation Sector |
: Education |
| Department |
: Department Of Higher Education |
| Organisation Name * |
: Indian Institute Of Technology |
| Organisation Type * |
: EDUCATIONAL RESEARCH INSTITUTE |
| Organisation Authority * |
: Central |
| Organisation Parent * |
: Indian Institute Of Technology |
| Organisation Abbreviation * |
: IIT |
| Organisation Synonyms * |
: Iit, Iit, Iit |
| Address |
: 208016,Central Store &
Purchase Section, Iit Kanpur,
Gt Road, Kalyanpur 208016
(Up) |
Document Data |
| Emd Data |
:
| EMD Amount | 154000.0 |
| Advisory Bank | State Bank of India |
| EMD Percentage(%) | |
|
| Department Name |
: Department Of Higher Education |
| Office Name |
: Kanpur |
| Organisation Name |
: Indian Institute Of Technology (iit) |
| Item Category |
: CO2 Fire Extinguisher , Co2 Fire Extinguishers 2kg , ABC Type Fire ext 6kg MAP , K Type wet chemical fire extinguishers for mess area 6kg , D type fire extinguishers 2kg TEC Powder , Foam Fire Extinguisher 9 L , Hose pipe RRL 15 meter , Fire Suit Complete set , Sealing Hook , Fire Revolving BrancSteel , Discharge Tube with Horn , ABC 6kg Discharge Tube with Horn , Mechanical Fire Hose Nozzle with horn , Extension Ladder rope , Fire Rope 10 mm dia, 10 m long , Foldable Stretcher , Electrical Rescue Hook Insulated , Hydrant Coupling Washers , Hydrant Blank Caps , SCBA Set , Hose reel drum washer , Fire extinguhsers washer co2 , Foam Making 5x with pickup tube , Foam Making 10x with pickup tube , Fog branch , Triple pupose branch , Collecting head two way , non sparking Firemen Axe , collecting head four way , safety helmet red , height rescue kit , wheel chock , Tool box , Full body harness Safety Belt , Foam pickup tube , Hose reel shut off nozzle , Foam AFFF , Hose reel pipe 30 mtr , Hanging hook Co2 extinguisher , Hanging hook ABC 6kg , Hosereel drum |
| Total Quantity |
: 3319 |
| Primary Product Category |
: CO2 Fire Extinguisher |
| Boq Title |
: FIRE FIGHTING EQUIPMENTS |
Other Document Data |
| Time Allowed For Technical Clarifications During Technical Evaluation |
: 2 Days |
| Evaluation Method |
: Total Value Wise Evaluation |
Prequalification Data |
| Document Required From Seller |
: Experience Criteria,Past Performance,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC),Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer |
| Past Performance |
: 80 % |
| Bid To Ra Enabled |
: No |
* denotes processed/normalized values by our data processing