SITC Modular 200 KVA N Plus 1 UPS with 30 min battery
back up as per Technical specification and drawings , SITC
Modular 50 KVA N Plus 1 UPS with 30 min battery back up as
per Technical specification and drawings , SITC 10KVA UPS
with inbuilt isolation transformer and 30 min battery backup
as per Technical specification and drawings , K13 Isolation
Transformer 220 KVA 3PH minus 1PH along with all
accessories , K13 Isolation Transformer 55 KVA 3PH minus
1PH along with all accessories , SITC of wall mount DB with
associated monitoring modules , SITC of static switch , SITC
of requisite IT infrastructure administrative laptop
monitoring display as per technical specifications , SITC of
conventional Copper Earthing System along with all
necessary installation accessories, as per technical
specifications , SITC of pure copper strip 25mm by 3 mm as
per technical specifications , SITC of 9percent pure PVC
insulated copper cable of 50mm square cross section , Cost
of supply of Miscellaneous Installation Material for all
supplies along with all necessary fitting accessorie, as per
specifications , Cost of Supply of Training Manuals and other
documentation in 03 hard and soft copies as per
requirements , Cost of Onsite Training for 08 AAI nominees
for 5 working days , Cost of Laying Installation Integration
Testing and Commissioning of complete system by
successful as per technical specifications and drawings at New delhi, New delhi
Tender Detail |
Reference Number |
: GEM/2024/B/4852738 |
Tender Source |
: https://bidplus.gem.gov.in/showbiddocument/6302770 |
State |
: New Delhi |
City |
: New Delhi |
Tender value |
: 170112519.0 |
Earnest money deposit (EMD) |
: 3402250.0 |
Type |
: Open |
Category |
: Goods |
Description |
: Bid Offer Validity : 180 (Days) Evaluation Method : Total Value Wise Evaluation Minimum Avg Turnover : 404 Lakh (S) Quantity : 3159 |
Important Dates |
Bid Submission Start Date |
: April 10, 2024, 5:32 p.m. |
Bid Submission End Date |
: May 1, 2024, 3 p.m. |
Published on |
: April 10, 2024, 5:32 p.m. |
Bid Open Date |
: May 1, 2024, 3:30 p.m. |
Organisation Data |
Organisation Name |
: Airports Authority Of India |
Organisation Sector |
: Aviation |
Department |
: - |
Organisation Name * |
: Airports Authority Of India |
Organisation Type * |
: PSU |
Organisation Authority * |
: Central |
Organisation Parent * |
: Airports Authority Of India |
Organisation Abbreviation * |
: AAI |
Organisation Synonyms * |
: Airport Authority, Air Auth Of India |
Address |
: 110037,Airport Authority
Of Nats Building Igi Airport
Palam New Delhi |
Document Data |
Epbg Data |
:
Advisory Bank | ICICI |
ePBG Percentage(%) | 5.0 |
Duration of ePBG required (Months). | |
|
Emd Data |
:
EMD Amount | 3402250.0 |
Advisory Bank | State Bank of India |
EMD Percentage(%) | |
|
Department Name |
: Airports Authority Of India (aai) |
Office Name |
: Aai Rhq Nr |
Ministry State Name |
: Ministry Of Civil Aviation |
Organisation Name |
: Airports Authority Of India ,rhq Nr - Rangpuri |
Item Category |
: SITC Modular 200 KVA N Plus 1 UPS with 30 min battery back up as per Technical specification and drawings , SITC Modular 50 KVA N Plus 1 UPS with 30 min battery back up as per Technical specification and drawings , SITC 10KVA UPS with inbuilt isolation transformer and 30 min battery backup as per Technical specification and drawings , K13 Isolation Transformer 220 KVA 3PH minus 1PH along with all accessories , K13 Isolation Transformer 55 KVA 3PH minus 1PH along with all accessories , SITC of wall mount DB with associated monitoring modules , SITC of static switch , SITC of requisite IT infrastructure administrative laptop monitoring display as per technical specifications , SITC of conventional Copper Earthing System along with all necessary installation accessories, as per technical specifications , SITC of pure copper strip 25mm by 3 mm as per technical specifications , SITC of 9percent pure PVC insulated copper cable of 50mm square cross section , Cost of supply of Miscellaneous Installation Material for all supplies along with all necessary fitting accessorie, as per specifications , Cost of Supply of Training Manuals and other documentation in 03 hard and soft copies as per requirements , Cost of Onsite Training for 08 AAI nominees for 5 working days , Cost of Laying Installation Integration Testing and Commissioning of complete system by successful as per technical specifications and drawings |
Total Quantity |
: 3159 |
Primary Product Category |
: SITC Modular 200 KVA N Plus 1 UPS with 30 min battery back up as per Technical specification and drawings |
Boq Title |
: SITC OF COPS AT NIA JEWAR |
Estimated Bid Value |
: 170112519 |
Ra Qualification Rule |
: 50% Lowest Priced Technically Qualified Bidders |
Other Document Data |
Bid Offer Validity |
: 180 (Days) |
Time Allowed For Technical Clarifications During Technical Evaluation |
: 3 Days |
Evaluation Method |
: Total Value Wise Evaluation |
Inspection Required By Empanelled Inspection Authority Agencies Pre Registered With Gem |
: No |
Payment Timelines |
: Payments Shall Be Made To The Seller Within 200 Days Of Issue Of Consignee Receipt-Cum-Acceptance Certificate (Crac) And On-Line Submission Of Bills (This Is In Supersession Of 10 Days Time As Provided In Clause 12 Of Gem Gtc) |
Prequalification Data |
Document Required From Seller |
: Experience Criteria,Bidder Turnover,Certificate (Requested in ATC),OEM Authorization Certificate,OEM Annual Turnover,Additional Doc 1 (Requested in ATC),Additional Doc 2 (Requested in ATC),Additional Doc 3 (Requested in ATC),Additional Doc 4 (Requested in ATC),Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer |
Years Of Past Experience Required For Same Similar Service |
: 3 Year (s) |
Minimum Average Annual Turnover Of The Bidder For 3 Years |
: 404 Lakh (s) |
Oem Average Turnover Last 3 Years |
: 5393 Lakh (s) |
Mse Exemption For Years Of Experience |
: Yes |
Startup Exemption For Years Of Experience |
: Yes |
Bid To Ra Enabled |
: Yes |
* denotes processed/normalized values by our data processing